Embraer E-Jet emergency procedures: how crews handle failures in the air
Embraer E-Jet emergency procedures follow a common airline pattern: fly the aircraft first, identify the failure from the EICAS messages, apply any memory items, then work through the Quick Reference Handbook (QRH) with the other pilot while managing communication and diversion. The detailed steps for each failure are in the operator's approved manuals and cannot be replaced by a general article.
This guide explains the method and the main emergency categories on the E170, E175, E190 and E195 family and the newer E2 series, so that student pilots know what type-rating simulator sessions will test.
Updated October 2026 · Editorial team, Golden Epaulettes Aviation
Key facts: Embraer E-Jet emergency procedures
- Aircraft family: E170/175/190/195 (first generation, GE CF34 engines) and E190-E2/E195-E2 (second generation, Pratt & Whitney PW1900G engines).
- Core method: aviate, navigate, communicate; then identify the failure, apply memory items if any, and use the QRH.
- Alerting: failures are shown as EICAS messages with different priority levels; the crew responds in order of priority.
- Typical emergencies trained: engine failure or fire, smoke or fire in the cabin or cargo, rapid decompression, hydraulic or electrical failure, and evacuation.
- Where it is trained: in the type-rating course on a full-flight simulator, after a CPL and instrument rating.
- Authority: manuals are approved by the regulator (DGCA in India); Embraer and the operator publish the actual checklists.
The basic emergency method
Every airline teaches a version of the same sequence. The Pilot Flying keeps control and flies the flight path; the Pilot Monitoring reads the messages, runs the checklist and handles radio calls. Roles are stated clearly so that workload is shared.
- Maintain control and the flight path (aviate), then navigate.
- Identify the failure from the EICAS message and confirm it before acting.
- Carry out memory items only if the checklist requires them.
- Run the QRH procedure, read and do, with each action cross-checked.
- Decide on the diversion, brief the cabin crew and passengers, and tell ATC.
- Plan the approach, landing and any evacuation needs.
The idea is to avoid hasty actions. Many serious incidents have involved the wrong engine or system being shut down, so crews confirm before they act.
Engine failure and engine fire
On a twin-engine jet the aircraft is certified to continue take-off, climb and cruise on one engine. The crew's first job is to fly the aircraft on the remaining engine, manage rudder and speed, and then identify the failed engine.
- Engine failure after take-off: fly the planned one-engine-inoperative path, clean up the aircraft at the safe altitude, then run the checklist.
- Engine fire: the EICAS and fire warning direct the crew to isolate the engine, close the fuel and bleed supplies, and use the fire bottles if needed.
- Single-engine landing: the crew plans the approach and go-around performance before committing to land.
Exact speeds, altitudes and switch actions depend on the manual in use and are drilled repeatedly in the simulator.
Smoke, fire and fumes
Smoke or fire in the cabin, flight deck or cargo compartment is treated as time-critical. Crews wear oxygen masks and smoke goggles if required, identify the source, isolate the system, and descend and land at the nearest suitable airport.
A diversion decision is normally made early. The commander coordinates with the cabin crew and prepares for a possible evacuation on the ground.
Rapid decompression and emergency descent
If cabin pressure is lost, the first action is to put on the oxygen masks and establish communication. The crew then starts an emergency descent to a safe altitude where oxygen is not needed, while checking terrain and informing ATC.
| Phase | Typical focus |
|---|---|
| Recognition | Cabin altitude warning, noise, mist, cabin pressure indications. |
| Immediate actions | Oxygen masks on, communication established, autopilot and descent initiated. |
| Descent | Descend to a safe altitude, check terrain and traffic, use speed brakes if the procedure calls for it. |
| After descent | Level off, assess cause and remaining oxygen, decide on diversion. |
Hydraulic, electrical and flight-control failures
Failures of systems such as hydraulics, electrics or flight controls are shown by EICAS messages and usually have their own QRH procedure. These are often non-normal rather than emergency, but they can limit landing configuration, braking or autopilot use.
On the E2 series the flight controls are fly-by-wire, with protections that change if control laws degrade; first-generation E-Jets use a different control arrangement. Check which generation a procedure applies to before assuming the same steps.
Evacuation and CRM
If the aircraft must be evacuated, the commander makes the call and the cabin crew run the evacuation. Clear briefings, standard calls and cross-checking between pilots and cabin crew matter as much as the checklist itself.
Related reading: aviation safety procedures, flight operations procedures and how another jet type handles the same topic in Airbus A320 emergency procedures.
What this means for your pilot career
You will not practise E-Jet emergency drills before getting a licence, but the skills behind them are built earlier: instrument flying, systems knowledge and CRM. The DGCA CPL ground subjects, covered in our DGCA CPL ground classes, give you the theory base that type-rating courses assume.
If you are curious about the type, read Embraer E-Jet pilot training and E-Jet reliability. For the path from student to airline, see how to become a pilot in India.
Sources and official references
- Embraer Commercial Aviation – E-Jets family (accessed October 2026)
- SKYbrary – Emergency and abnormal procedures (accessed October 2026)
- ICAO – safety and operations standards (accessed October 2026)
- DGCA India – regulations and CARs (accessed October 2026)
- EASA – operations and safety information (accessed October 2026)
Next steps
If you are preparing for the DGCA CPL theory papers and want to build the systems and procedures knowledge that type-rating courses rely on, talk to us. Message us for a free counselling call; classes run in Delhi and live online.
Talk to a counsellor on WhatsAppReviews & Discussion
Write a review
No reviews yet. Be the first!
